Freo's View

MOST TREES RETAINED AT HIGH STREET UPGRADE

 

MAINROADS has issued a statement concerning the preservation of trees at the Fremantle High Street Upgrade project, which I post in part below.

There is still no word if the City of Fremantle will receive land at Clontarf Hill in exchange for the loss of CoF land for the High Street Upgrade.

Since Commonwealth and State funding was received in May 2017, we have been working in partnership with the City of Fremantle to develop a concept plan that meets the key objective of improving safety on High Street, while minimising impacts to the surrounding environment – particularly established trees. These measures include:

Overall clearing footprint: There are 245 large trees in the project area between Carrington Street and Stirling

Highway. While earlier versions of this project would have required significant clearing, our final concept design retains at least 178 (or 72%) of these trees. 67 (28%) will be cleared.

Nesting hollows: No current or potential nesting hollows for black cockatoos or other species are impacted by the project.

Future potential breeding trees: 64 (of 245) trees within the project area are considered to be future potential breeding trees (there is no current evidence of breeding).

The project will retain at least 48 (75%) of these trees. 16 (25%) will be cleared.

Tuart trees: 31 trees within the project area are tuarts. We’ve changed our design to save at least 13 of these tuarts. This includes specimens close to the Fremantle Netball Centre estimated to be between 40 and 50 years old.

Design changes: The project will provide a tree-lined median between the eastbound and westbound carriageways. While providing an attractive gateway into the city, this measure allows 28 trees to be preserved.

Landscaping and Urban Design: We have developed a Landscape and Urban Design Framework and specified a high standard of urban design for the project through consultation with local stakeholders including the City of Fremantle and the local community. The detailed development of the urban design will involve a coordinated team of urban designers, landscape architects, a public artist and public arts coordinator, and will include further consultation with local stakeholders. The detailed landscaping plan comprises soft landscaping, involving extensive planting and revegetation with species appropriate to the local area. The planting work will be done by a specialist contractor in the first winter following construction completion.